Power and optoelectronic semiconductors need measurements at both extremes: capacitances of about 1 pF, currents in the femtoampere range and voltages up to several kilovolts. The tasks below cover C-V characterisation of power devices, I-V measurements on photodiodes and MOSFETs, and junction capacitance of photodiodes.
Typical test tasks
| Test task | Device | Typical test conditions | Recommended set-up |
|---|---|---|---|
| C-V characteristics of high-voltage power devices | IGBT modules for wind power, traction and PV inverters | Drain-source voltage from 1300 V up to 3000 V; integration into automated lines | TH513 C-V analyzer with TH513-1 test fixture and safety interlock |
| Parasitic capacitance of MOSFETs | Discrete MOSFETs, multi-chip devices and modules | Ciss, Coss, Crss, Rg; VGS about 20 V, VDS 0–1000 V | TH510 series semiconductor C-V analyzer (TH512 for VDS up to 1500 V) |
| Dark current of avalanche photodiodes (APD) | APDs for optical communication, laser ranging and medical imaging | Dark current around 0.9 nA; measurement in a shielded set-up | TH199X source/measure unit with shielded test box and triaxial cables |
| MOSFET matching | MOSFET pairs for high-frequency power supplies | Threshold voltage and transconductance curves | TH199X source/measure unit with TH26087B adapter box, TH26087E shielded test box and TH26087G triaxial cables |
| PN junction capacitance of photodiodes | Photodiode chips and devices | About 1 pF at 1–2 MHz, bias 10–40 V; single- or double-sided chip contacting | TH2838 precision LCR meter (TH2838H for DC bias up to ±40 V) |
| Characterisation of power devices | Power MOSFETs and IGBTs | IV parameters, capacitance, gate charge and power loss | TH521 power device analyzer |
What to consider
- Safety at high voltage. C-V tests at kilovolt levels need fixtures with an interlock, and an analyzer that withstands a device breakdown during the test.
- Shielding for low currents. Femtoampere and picoampere measurements need shielded test boxes and triaxial cables. Otherwise noise dominates the result.
- Automation. For production test, check the handler interface and the remote-control protocol (for example SCPI) before you plan the line.